Bahrain, Hidd
Kingdom Asphalt completed comprehensive road improvement works along Avenue 46 and Road 4338 in Arad, Block 243. The project focused on upgrading the existing road network to improve accessibility, traffic flow and overall road safety within the area.
The scope included earthworks, utility upgrades and relocations, stormwater drainage construction, footpaths, block paving and the reconstruction and rehabilitation of existing roads with asphalt paving. The project also covered road markings and traffic sign installations, delivering improved and reliable infrastructure in accordance with Ministry of Works standards.